Why the Dream Centre?

ICC Nairobi's vision is to raise godly generations.
Since our founding in 1983, we have grown into one of Nairobi's most vibrant, multi-cultural congregations and our children's ministry has grown with us. The challenge: we have outgrown every space we have.
The Dream Centre is the answer: a seven-storey building of ~5,715 m², designed from the ground up for children aged 0–18. Every floor. Every room. Every detail. Designed with a child in mind from the youngest infant in the crèche to our 18-year-old teenagers leading worship on the sixth floor.
Intentional Ministry
Every floor purpose-built for a specific age group — teaching, tech and environment tailored for each child.
No Child Left Behind
The Champions Club gives children with special needs their own entire floor — sensory rooms, specialist staff.
Teens Own Church
A state-of-the-art auditorium where teenagers lead their own worship, run their own services.
2,000+ Per Service
Upon completion, the Dream Centre will accommodate over 2,000 children per Sunday service.
“Let ALL the children come to me, and do not hinder them.”
A Word From Our Senior Pastor

“This is not just a construction project. This is a declaration that our children matter, that their faith formation matters, and that ICC Nairobi is willing to go all in to give them the very best.”
Dear friends of ICC Nairobi, I write to you with great joy and need in the same breath. What you see rising on our campus is more than concrete and steel, it is a seven-storey declaration that the next generation is worth every sacrifice.
Since 1983, ICC Nairobi has been a church that believes in raising godly generations. Today, we have outgrown every space we have and the Dream Centre is God's answer to that growth, specifically for our Children. The structure is complete. All seven floors stand. What remains is to breathe life into every room: colour on the walls, chairs in the classrooms, a stage in the teens auditorium, equipment in the studio. I invite you to partner with us — financially, through prayer, through your skills, and through your time. Every cent, every prayer, every hour of service is a seed planted in the next generation.
Bishop Gibson Anduvate
Senior Pastor, ICC Nairobi
“For we walk by faith, not by sight. — 2 Corinthians 5:7”
Current Progress
Phase 1 construction is complete — all seven floors stand. Finishing and fit-out funding is tracked below. Target occupation: November 2026.
Phase 1 — Contractor Payouts to Date
Payments made to the main contractor against the Phase 1 contract value.
KES 153,380,738 of KES 239,894,906 (64%)
Phase 1 — Pledges Redeemed
Church pledges already redeemed toward the Phase 1 outstanding balance.
KES 20,383,003 of KES 86,514,168 outstanding (24%)
Remaining Financial Ask
Phase 1 funding gap after redeemed pledges, plus Phase 2 finishing works (KES 128,400,000).
- Phase 1 funding gap: KES 66,131,165
- Phase 2 finishing total: KES 128,400,000
- Combined remaining ask: KES 194,531,165
Current Updates




From dream to seven storeys standing